Executive Order 12902

Energy Efficiency and Water Conservation at Federal Facilities

This executive order directs federal agencies to reduce energy consumption in buildings by 30 percent by 2005 and increase industrial facility energy efficiency by 20 percent by 2005, using 1985 and 1990 baselines respectively. It mandates comprehensive energy and water audits, prioritization surveys, implementation of cost-effective conservation measures, expanded use of solar and renewable energy, innovative financing mechanisms like energy savings performance contracts, and new procurement standards for energy-efficient products.

No PDF available for this document.

Impact dates

  1. Energy consumption reduction and efficiency increase goals target year

  2. Agencies report facility redesignations to FEMP and OMB

  3. Prioritization surveys completed on all facilities; GSA procurement techniques developed

  4. First President's Management Council report due; annual reports begin

  5. Agency facility commissioning programs established; life cycle value engineering studies completed; model building commissioning program distributed

  6. DOE submits renewable energy program to 656 Committee

  7. Agencies begin implementing existing audit recommendations; DOE technical assistance guidance; GSA utility contacts and lists; DOE/GSA contractor lists

  8. Task Force determines Btu-per-gross-square-foot ceiling for new facilities

Key directives

  • 30% energy consumption reduction by 2005 (1985 baseline) for federal buildings per gross square foot
  • 20% energy efficiency increase by 2005 (1990 baseline) for industrial facilities
  • prioritization surveys within 18 months on all facilities
  • comprehensive facility audits: 10% annually or 10 per year for small agencies
  • implement cost-effective recommendations within 180 days of audit completion
  • begin implementing existing audit recommendations within 180 days
  • DOE renewable energy program within 210 days
  • new facility Btu ceiling within 120 days
  • facility commissioning program within 270 days
  • model building commissioning program within 270 days
  • life cycle value engineering studies within 270 days
  • retain utility rebates and savings starting FY 1995

Who is ordered

Timeline

Immediate

  • order takes effect immediately (March 8, 1994)
  • revocation of Executive Order 12759 (except sections 3, 9, 10)

Near term (90d)

  • within 120 days: Task Force to determine Btu-per-gross-square-foot ceiling for new facilities
  • within 180 days: agencies begin implementing existing audit recommendations
  • within 180 days: DOE to develop technical assistance guidance and training materials
  • within 180 days: GSA to contact utilities for no-cost audits and demand-side management services
  • within 180 days: DOE and GSA to make available national lists of qualified contractors
  • within 180 days: agencies to develop showcase facility demonstration plans

Long term

  • within 18 months: agencies complete prioritization surveys on all facilities
  • within 18 months: GSA to develop procurement techniques for energy/water technologies
  • within 21 months: agencies report facility redesignations to FEMP and OMB
  • by 2005: 30% energy consumption reduction in federal buildings
  • by 2005: 20% energy efficiency increase in industrial facilities
  • 10-year plan for comprehensive facility audits (10% annually)
  • annual reporting requirements ongoing
  • President's Management Council reports every 2 years starting March 1995

Risks & tensions

  • Cost-effectiveness threshold (10-year payback) may exclude deeper efficiency investments with longer returns
  • 'To the extent practicable' and 'cost-effective' qualifiers create implementation flexibility that may weaken compliance
  • Exemption process for mission-inconsistent facilities could substantially reduce covered footprint
  • Leased facilities provisions weaker than owned facilities due to lease term and practicability constraints
  • 10-year audit timeline means some facilities may not be audited until near or after 2005 target date
  • Dual-fuel capability mandate contains cost-effectiveness and practicability escape clauses
  • Retention of savings provision contingent on OMB/DOE/DOD/GSA guidelines and legal permissibility—uncertain implementation